Design the duty path before advertising it
Ask the electrical contractor to supply its written criteria for passing a call directly to duty staff, the area served overnight and the backup contact. Reception should capture what the caller reports and use that approved path. A caller requesting a quote for a future installation can go to the estimating queue with a preferred site-visit time.
A CYOO call example
For a planned outlet installation, have Cece record the property type, service area and preferred callback time. For a reported fault, pass the caller’s description to dispatch.
What the team does next
Keep troubleshooting with the electrician. Test the company’s urgent-call routing separately from its estimate-request queue.
What the dispatcher needs after a transfer
Record the address, callback number, time and which destination answered. During testing, deliberately leave the first duty contact unavailable. Ask the backup dispatcher to describe the issue using the note alone. If they cannot tell whether anyone has accepted the job, add an explicit acceptance field or manual check.
